Metro Water Services

Engineering

ANNOUNCEMENTS

  • Requests for Permits form now available online! Save yourself a trip to MWS – download a faxable Requests for Permits form.

INFORMATIONAL DOCUMENTS

Plan Submittal Review Requirements
  • Provide 2 sets of 24" x 36" Construction Plans
  • Provide Applicable Water and Sewer Design Calculations
  • Provide Construction Plan Review Checklist - Appendix 4 (completed)
  • Provide Plans Review Fee Worksheet (completed Excel spreadsheet)
  • Provide appropriate review fee (calculated)
  • Provide Availability Letter or Receipt of Capacity Fee Payment (minimum 30% Capacity)
  • Guide to New Construction: Commercial* PDF
  • Guide to New Construction: Residential Subdivision* PDF
  • Technical Specifications and Construction Details* HTML
  • Request for Water and Sewer Availability PDF
  • Plans Review Fee Worksheet EXCEL

Enter the required data in the appropriate blue highlighted fields. Print the tabulated results from the excel spreadsheet on 8.5 x 11 paper.

  • Trades Advisory Council HTML

*NOTE: These materials are provided for information only and are not intended to be a legal documents. Revised March 2004.

PRESENTATIONS

  • Engineering Plans Review: Mike Morris, January 21, 2005 PDF
  • Permits Presentation: Mary Ellen Jackson, March 4, 2005 PDF

If you have any questions which are not addressed through this web site, please email sonia.harvat@nashville.gov.